Lab C Up & Running
All of Ms. Kline's Keyboarding/Technology classes contributed to Day 1 of the Labs C & D Set-up Effort which involved:
- Disconnecting peripheral devices from each eMac
- Disconnecting the power cords & Ethernet cables
- Unlocking the lock-down cables and mouse/keyboard locks
- Moving each eMac to Lab C from Lab D
- Reconnecting the cables & peripherals
- Locking down each eMac and its mouse and keyboard
- Making sure the cables were stored properly so that the lab tables could be locked
- Testing each machine to make sure they powered up and could connect to the Internet
0 Comments:
Post a Comment
<< Home